Marquez ConcreteNoonday · East Texas

Job file

A walkway pour, screeded by hand

Concrete sidewalks

Four men in yellow shirts screeding a fresh concrete walkway between staked forms beside a brick building

A four-man crew strikes off a fresh concrete walkway between staked forms, pulling the screed across the pour before it is floated and finished.

The concrete is in the forms and the crew is striking it off. Two finishers kneel at the forms and draw the screed board across the pour, riding the top of the forms so the walk comes out at the height and slope they were set to. The others pull the extra concrete ahead of the board with rakes, so the board never runs short.

Caution tape keeps foot traffic off the fresh concrete while it is being worked.

What happens next

Once the surface is level, it is floated to close it up, the edges are tooled, and control joints go in so the walk cracks where it is told to. A broom finish goes on last for grip when it is wet.

Ask for a date

Free on-site estimate anywhere around Noonday and Tyler. Call us or send the form, and you hear back within 24 hours.

Based in
Noonday, Texas
Works
Noonday, Tyler & East Texas
Hours
Mon–Fri7 AM – 6 PMSat8 AM – 4 PMSunClosed
Email